Red Cycler 5C Instruções de Operação Página 191

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 190
07-19-61-244 October 2, 2009 HomeChoice APD Systems Patient At-Home Guide 11-17
11. Operating Instructions – Prepare for Therapy
4. Connect the line to the heater bag as you have
been taught by your dialysis trainer.
5. Repeat for all the solution bags necessary for your treatment.
The lines with white clamps are for additional solution bags.
6. Leave any unused lines in the organizer with clamps closed.
7. Review your connections to make sure that:
a. The line with the RED clamp is connected to the solution bag on the
heater pan.
b. The solution bag on the heater pan covers the heater button on the right
end of the heater.
c. The line with the BLUE clamp must be connected to the Last Fill solution
bag if you use a Last Fill with a different solution.
d. You have connected enough bags of the right size to deliver your
prescribed volume.
Steps to connect solution bags (Continued)
a
b
d
c
GO
STOP
ENTER
Vista de página 190
1 2 ... 186 187 188 189 190 191 192 193 194 195 196 ... 376 377

Comentários a estes Manuais

Sem comentários